Condo Renovation Cost in Singapore: By-Laws, Quotes and the Budget

Condo renovation needs the MCST's permission and a written quote. There is no national price. HDB flats, by contrast, use the DRC and a permit.

The pool at Astoria Park, a condominium in Singapore
Astoria Park, a condominium in Singapore. Photo: Timo Sippala, CC BY-SA 2.5, via Wikimedia Commons
On this page
  1. Two permissions, one invoice
  2. The quote, not a sample invoice
  3. Cash flow and the mortgage
  4. After the work
  5. Hours, lifts and neighbours
  6. HDB’s directory does not govern the condo
  7. Money in the same month as completion

Key takeaways

  • The MCST must clear works that the by-laws list, before the contractor starts.
  • Any deposit for common property is the sum the MCST states, refunded if you leave the lobby intact.
  • The price is the written quote. This page does not publish a sample invoice.
  • A renovation loan instalment counts in TDSR. Get the housing approval first, or pay cash.

The numbers

Who else must agree
The MCST, under the by-laws
Deposit
Whatever the MCST's letter or by-laws require
Hours
Set by the by-laws, not by the contractor's preference
Price
The quote. No figure is printed here
Financing
Cash or a separate renovation loan

Two permissions, one invoice

HDB flats have a renovation permit. Condos have by-laws and a management office. The Building Maintenance and Strata Management Act sits behind the by-laws. Your contractor does not outrank them. Submit the drawings the MCST asks for, book the lift, and keep to the hours. A crew that hacks on a Sunday because the client is impatient can be stopped, and the deposit is how the lobby tiles get replaced if the protection fails.

Ask for the by-laws before you pay the option fee on a resale unit you intend to gut. Some estates restrict moving wet areas. A quote that assumes the kitchen can move to the living room is worthless if the by-laws say no. The buying guide already tells you to read the MCST file for fees. Add the renovation by-laws to that reading. Fourteen days is enough to ask the manager one clear question and not enough to redesign after you have exercised.

The quote, not a sample invoice

Ask each contractor to price the same scope: painting or not, kitchen, wardrobes, lights, waterproofing, air-conditioning, and protection of common property. Ask for GST as its own line if they charge it. Type that quote into the renovation field of the total cost calculator. Do not type a number from the internet.

A new launch often includes floors and a basic kitchen. A resale unit might not. Do not treat them as the same job. If the kitchen works, leave it off the quote.

The MCST deposit, if the by-laws or the manager require one, is cash held against damage. It is not the contractor’s price. Ask the manager for the sum and for when it comes back. This page does not state one.

Cash flow and the mortgage

The deposit and the contractor’s first payment can fall in the same month as completion, beside the rest of the downpayment and stamp duty. List that month. If the cluster is larger than your cash, reduce the scope. A renovation loan adds an instalment that TDSR counts. The renovation loan guide explains the test and does not set a rate. Get the housing approval first, or pay cash.

Defects in a new sale are the developer’s during the liability period. Do not pay your contractor to fix the developer’s crack and then lose the warranty. The defect guide covers condos and BTO flats. Log the defects, then renovate around them.

After the work

The joint inspection with the MCST is what releases the deposit. Take photographs of the lobby and the lift before the first delivery. A scratch that was already there becomes your scratch if you cannot show the date. Inside the unit, keep warranties for waterproofing and for carpentry. They are the leverage when a drawer fails later.

The quarterly MCST fee does not fall because you renovated. You may have a nicer kitchen and the same share value. The maintenance guide is that permanent bill. Budget both: one project, then a fee for as long as you own the unit. The project is negotiable. The fee is not, except at an AGM with every other owner.

Hours, lifts and neighbours

By-laws typically confine noisy work to weekdays and a band of hours, and they ban it on public holidays. A contractor’s promise to “finish on Saturday” may be a promise to breach the by-laws. Confirm the hours in writing and put them in the contract. Deliveries go through the service lift you booked. The passenger lift is how your deposit gets spent. Photograph the cabin before the boards go up.

Wet works are the expensive fight. Moving a kitchen or a bathroom can be forbidden, or allowed only with a licensed plumber and a waterproofing inspection. If the by-laws say the wet area stays, delete that line from the quote before you sign it. A beautiful plan the manager rejects is a variation order. Variation orders are where renovation budgets break. Freeze the drawings before the first payment, after the MCST has stamped them.

A new launch’s defect period overlaps the renovation. Coordinate so the developer’s contractor can reach the defect, and yours does not cover it up. If you tile over a hollow floor before the developer inspects it, you own the hollow floor. The sequence is inspect, report, let them repair, then overlay. Impatience is a cost.

Resale buyers should switch on every tap and the air-conditioning during the viewing. A unit that cools is a unit you might not renovate. Leaving a working kitchen in place does not need a quotation. Scope is the budget. The district and the floor are not.

When the deposit returns, the renovation account can close. Keep the warranties with the title deeds. The next buyer will ask, and the sale guide tells you to have them ready. A renovation you can document is a feature. A renovation you only remember is a discount.

HDB’s directory does not govern the condo

If you also own or are buying an HDB flat, that flat uses a different checklist. HDB says you engage a contractor from the Directory of Renovation Contractors and you get a permit before works that need one. A condo is the MCST’s by-laws, not that directory. Do not assume a DRC listing is what the manager asked for, and do not assume an MCST letter satisfies HDB.

The site owner also runs a renovation contracting business. The introduction form says so. You choose the contractor and you pay them. This page does not claim that anyone introduced is on the DRC or approved by your MCST. Check both yourself.

Money in the same month as completion

On a resale condo the completion statement, any MCST deposit, the contractor’s first payment and the mover can fall in one fortnight. Update the total cost calculator with the real quote before you exercise. The option period is the time the scope can still change the offer. After exercise, the price is fixed.

Variations you did not sign are not payable. Say that in the contract. A foreman who changes the lights and invoices them has changed the deal. The written variation is the only upgrade. When the last snag is closed and any MCST deposit is back, money you did not have to spend stays in the account. A leak that shows up after handover is still this renovation if the warranty says so. Call the contractor back under the warranty before you pay someone else to open the floor.

Get an introduction

Tell us what you need. The service below is set for this page and you can change it. Fiona replies on WhatsApp.

Fiona Wang (PropNex, CEA R068552B) is a Singapore property agent. For services outside estate agency we introduce you to independent professionals; you choose and pay them directly. If a referral fee or related-party interest applies we will tell you before you engage.

Questions on this topic

How much does it cost to renovate a condo?

The sum of the lines on a written quote for your scope, plus any MCST fees. A one-bedroom paint job and a four-bedroom hack are not one price. Collect quotes on a fixed scope.

Do I need MCST approval?

For hacking, plumbing moves, and anything the by-laws list, yes. Cosmetic painting sometimes does not. Read the by-laws. The manager's verbal yes is weaker than the written consent.

What is the renovation deposit?

A sum the MCST holds against damage to lifts and lobbies. It comes back after they inspect, minus the cost of any damage. It is not the contractor's deposit.

Can the housing loan pay for it?

No. The mortgage is for the purchase. Renovation is cash or a renovation loan, and that loan's instalment counts under TDSR.

Is a new launch cheaper to renovate?

It is empty, so you are not demolishing someone else's kitchen. You still pay for every finish the developer did not include. A resale unit may need less if you can live with what is there.

Get a personalised Singapore shortlist and financing check

Share your budget and what you're comparing. We'll reply on WhatsApp with matching units, recent caveats and your exact cash/CPF breakdown.

Fiona Wang (Wang Ye), PropNex Realty Pte. Ltd.. CEA Reg. No. R068552B. Agency licence L3008022J.

We'll reply on WhatsApp. Your details go only to our agent and are never sold. See our privacy notice.

Sources

Facts on this page were checked against these sources on 12 November 2026.

  1. BMSMA: by-laws and the management corporation sso.agc.gov.sg, checked 12 November 2026
  2. HDB: Applying for renovation approval hdb.gov.sg, checked 12 November 2026
  3. HDB: Directory of Renovation Contractors hdb.gov.sg, checked 12 November 2026
  4. MAS: TDSR mas.gov.sg, checked 12 November 2026

Fact-checked against HDB, IRAS, CPF, MAS.