Free HDB valuations and condo shortlists WhatsApp +65 9182 3072 Call Contact

HDB Renovation Cost: What the Permit Allows and How to Read a Quote

HDB renovation is a permit plus a contractor's quote. Structural walls stay. Read the quote line by line. There is no single national price.

HDB blocks in Tampines
HDB blocks in Tampines. Photo: Terence Ong, CC BY 2.5, via Wikimedia Commons
On this page
  1. The price is the quote
  2. Permit and the Directory of Renovation Contractors
  3. How to read the quote
  4. After the keys

Key takeaways

  • HDB does not publish a renovation price. The quote is the price.
  • Use a contractor listed in the Directory of Renovation Contractors.
  • Works that need a permit start only after the permit is granted.
  • A renovation loan instalment counts in TDSR. This page does not state a loan rate.

The numbers

Who sets the price
The contractor's written quote, not HDB
Contractor
Listed in HDB's Directory of Renovation Contractors
Permit
Before works that need one. You authorise the submission
Related party
The site owner also runs a renovation business
Timing
After keys, and after HDB defects are logged

The price is the quote

HDB regulates what you may do to the flat. It does not publish a renovation price. Anyone who publishes an average for a 4-room flat without a survey, a year and a scope is guessing. This page will not. The number you can use is the written quote for the scope you asked for.

Before the quote, read HDB’s renovation rules. Works that need a permit must be submitted before they start. Structural elements stay. Windows, refuse chutes, and wet areas have their own conditions because water and the building’s fabric are not a design preference. A contractor who wants to start on Monday and “do the permit later” is a reason to choose a different contractor. Reinstating unauthorised work costs more than the original hack, and HDB can require it.

Resale flats and BTO flats differ in one practical way. A BTO flat is bare in the rooms HDB left bare, and the defects are HDB’s during the defect liability period. Log those first. The defect guide is the inspection. A resale flat is someone else’s renovation. You are paying to change it or to live with it. Budget the second possibility. A flat that needs only paint is a different invoice from a flat with a leaking bathroom.

Permit and the Directory of Renovation Contractors

HDB’s approval page says you engage a contractor listed in the Directory of Renovation Contractors for renovations in the flat. Contractors have to be on that directory before they carry out renovations in HDB flats. Some works, including works in the guidelines for building and sanitary work, need a permit. Start those works only after the permit is granted. Works that do not need a permit still have to follow the guidelines. If they do not, HDB treats them as unauthorised.

The page also says you authorise the contractor to submit the electronic application, and that the contractor attaches your signed acknowledgement. You get an SMS when HDB receives it. The permit, once granted, is on My HDBPage under My Flat, Purchased Flat, Renovation.

Step What you do Where it is written
1 Look the firm up on the DRC. Do not take a verbal “we are registered” DRC
2 Read whether your works need a permit Applying for approval
3 Sign the acknowledgement and authorise the electronic submission Same page
4 Wait until the permit is granted before those works start Same page
5 Keep the permit on site Your file

This site does not claim that any contractor it introduces is on the directory. Check the directory on the day you appoint them. The site owner also runs a renovation contracting business. That is a related-party interest. The form says so. You can appoint any DRC-listed firm, including one you found yourself, and you pay that firm directly.

How to read the quote

Send every contractor the same list: rooms, whether the kitchen carcass stays, whether bathrooms are waterproofed, whether air-conditioners are included, and the week you can give them the flat. Ask for GST as its own line if they are GST-registered. A total that leaves out haulage, protection or GST is not the amount you will transfer. Ask whether electrical work is done by a licensed worker, and whether waterproofing has a warranty stated in the contract.

Pay on the stages the contract states. Do not pay the last stage before a snag walk. A lump-sum line that says only “carpentry” cannot be compared. Break it down or do not sign it.

A renovation loan is separate credit. Its instalment counts in TDSR. The renovation loan guide explains that, without a sample interest rate. Get the housing approval first, or pay the contractor from cash. CPF used for the purchase is not a renovation fund. The CPF limit guide is about the price and the loan.

After the keys

On a BTO flat, collect keys, file defects, then start work that is yours. The defect guide and the key collection checklist are that order. On a resale flat, write a start date that moves if completion moves. The resale timeline is the purchase clock. Open the trap and the cistern at the viewing if you are worried about the bathroom, and add a bathroom line only if you saw a reason.

Book the lift with the town council. The movers guide says to ask the town council whether it charges. This page does not state a booking fee.

If you need somewhere to sleep while the flat is noisy, that stay is your cost. It is not in the contractor’s quote. Phase the work if someone has to remain in the flat, and write which rooms stay usable.

Get an introduction

Tell us what you need. The service below is set for this page and you can change it. Fiona replies on WhatsApp.

Fiona Wang (PropNex, CEA R068552B) is a Singapore property agent. For services outside estate agency we introduce you to independent professionals; you choose and pay them directly. If a referral fee or related-party interest applies we will tell you before you engage.

Questions on this topic

How much does it cost to renovate an HDB flat?

Whatever the written quotes say for the scope you chose. A coat of paint is not a new kitchen. Ask three contractors for the same scope and compare lines, not a single total from the internet.

Do I need HDB's permission?

For many common works, yes. HDB's renovation permit is applied for before the work. Some minor works are exempt. The permit page lists them. Do not rely on the contractor's memory.

Can I knock down a wall?

Only if it is not structural and the permit allows it. Load-bearing walls, beams and columns stay. A contractor who says every wall is fine is not the permit.

Can I use CPF or the housing loan?

The housing loan and CPF housing use are for the purchase, not for a new kitchen. A separate renovation loan is a personal credit product. Its instalment counts as a debt.

When should I renovate a new BTO flat?

After key collection, and after you have logged HDB's defects. Do not let your contractor repair HDB's defects in a way that blurs the warranty. The defect guide covers that window.

Get a free valuation

Tell us your block and flat type. We'll send recent prices for your block and nearby blocks, and what a sale would leave you after your loan and CPF refund.

Fiona Wang (Wang Ye), PropNex Realty Pte. Ltd.. CEA Reg. No. R068552B. Agency licence L3008022J.

We'll reply on WhatsApp. Your details go only to our agent and are never sold. See our privacy notice.

Sources

Facts on this page were checked against these sources on 12 November 2026.

  1. HDB: Applying for renovation approval hdb.gov.sg, checked 12 November 2026
  2. HDB: Directory of Renovation Contractors hdb.gov.sg, checked 12 November 2026
  3. MAS: TDSR, which counts a renovation loan instalment mas.gov.sg, checked 12 November 2026

Fact-checked against HDB, IRAS, CPF, MAS.