- The LTA and Malaysia's Ministry of Transport say passenger service is targeted for February 2027, subject to independent safety certification and final approvals.
- RTSO expects to finish final system tests and trial runs by 31 December 2026. Approvals come after that certification is reviewed.
- The Singapore station is Woodlands North and the Johor station is Bukit Chagar. Both already have guides on this site.
- Ownership floors, the local-company rule, 4% and 8% stamp duty, RPGT and SST stay as they are. The train is not a forecast of rents.
The numbers
- Target
- Passenger service in February 2027, subject to certification and approvals
- Trials
- Final system tests and trial runs expected by 31 December 2026
- Stations
- Woodlands North in Singapore, Bukit Chagar in Johor Bahru
- Rules
- Unchanged by the opening date
The RTS Link is a railway between Woodlands North and Bukit Chagar. For a Singapore business looking at a Johor shop, office or warehouse, the useful question is what the official timetable changes and what it leaves alone. The residential guides, including the main RTS page, the February 2027 delay note, the Bukit Chagar station and Woodlands North, stay the place for fares, the commute and condos. This page does not restate a fare.
The official timeline
On the joint release from the Land Transport Authority of Singapore and the Ministry of Transport, Malaysia, the grantors have been told by RTS Operations Pte Ltd that passenger service is now expected to commence in February 2027. The revised timeline remains subject to RTSO obtaining independent safety certification and securing final regulatory approvals.
Infrastructure works on both sides are substantially complete and remain on track to support passenger service once the remaining testing and commissioning are done satisfactorily. RTSO expects to complete final system tests and trial runs by 31 December 2026. After that, RTSO needs safety certification from an independent safety assessor. Regulatory approval to start passenger operations can be granted only after the authorities of both countries have reviewed that certification and are satisfied with it.
That is a target with conditions, not a date this site can upgrade to a promise. If the certification slips, the commercial rules in the next section still do not move.
What the opening does not change
| Subject | Still the rule after the trains run | Where we keep it |
|---|---|---|
| Who may buy a shop or factory | A foreign interest, on PTJ’s page: commercial from RM1 million, shops and shop-offices of three storeys and above, industrial from RM1 million | Buying checklist |
| Whose name is on a purchase | A local company for a commercial unit or industrial land of RM1 million or more acquired by a foreign interest, with notice to the Ministry of Economy before transfer | Same checklist |
| Stamp duty | 4% non-residential and 8% residential, for the foreign buyer the Stamp Act names, on instruments from the dates those items state | Calculator |
| RPGT | 30% in the first five years and 10% from the sixth, for a Part III disposer | Tax page |
| SST on a lease | 8% from 1 July 2025 when the landlord is taxable and no exemption applies. Not every lease. | Tax page, office, warehouse |
| Who may act as agent | A Malaysian registered estate agent and a Malaysian lawyer for the Malaysian contract. A CEA registration is Singapore only. | Adviser page |
| JS-SEZ incentives | Qualifying operators, Flagships A to G in the MIDA guideline, not a train-related rent subsidy | Incentive page |
| A right to work in Johor | A Malaysian pass, checked with the Immigration Department. The train does not issue one. | Office page |
Scenarios, not forecasts
These are ways a business might use the line. They are not predictions of rent, price or passenger volume.
A client-facing team in a JB office, with some people living in Singapore, may treat Bukit Chagar to Woodlands North as the cross-border leg of the commute, once passenger service is actually running. The lease, the SST question and each person’s permission to work in Malaysia are unchanged. Read the office checklist before you sign on the strength of the timetable.
A retailer or an F&B operator may prefer a shop in the city centre or nearer Bukit Chagar because more people will pass the door if the service starts. “If” is the right word. The shop page still requires the three-storey and RM1 million tests on a purchase, and a business licence from the council that covers the lot. Passing trade is not a PTJ category.
A warehouse in Pasir Gudang, Senai-Skudai or near Tanjung Pelepas does not become a city office because a passenger train reaches Bukit Chagar. Goods still move by road. The industrial page is the one that matches those places to flagship activities. The railway is irrelevant to floor loading, power and the certificate of completion and compliance.
A firm that only needs Singapore staff to visit a Johor supplier, and not to work there, still separates a business visit from employment. This page does not describe visit conditions. It only says the train is not itself the permission.
Where to read the stations
Bukit Chagar is the Johor station. Woodlands North is the Singapore station, on the Thomson-East Coast Line. The delay note records the move of the target to February 2027 for readers who started on the earlier date. Use those pages for the journey. Use this page for the commercial legal position, which is that the journey and the law are on different clocks.
Get an introduction
Tell us what you need. The service below is set for this page and you can change it. Fiona replies on WhatsApp.
Thank you
Fiona has your introduction request and will reply on WhatsApp. For anyone other than her estate agency work, you choose the professional and you pay them directly.
WhatsApp FionaQuestions on this topic
Is February 2027 a confirmed opening date?
The joint release says RTSO has informed the grantors that commencement is targeted for February 2027. It remains subject to independent safety certification and to both countries granting regulatory approval after they have reviewed that certification.
Does a shop near Bukit Chagar escape the RM1 million floor because of the station?
No. PTJ's foreign-interest minimum for a shop is still RM1 million, and the shop is still generally three storeys or more. The station does not appear in that guideline as an exception.
Will the train raise office rents?
This page does not forecast rents or prices. It separates what the official timetable changes, which is the journey, from what it does not change, which is the law on ownership, tax and licensing.
Singapore-side discussion
Fiona Wang is licensed in Singapore. Send this if you want to talk through the guide and ask for an introduction to a Malaysian registered estate agent and a Malaysian conveyancing lawyer. She does not sell or lease property in Malaysia.
Guides for Singapore readers. Fiona Wang (CEA R068552B, PropNex) is licensed in Singapore. Buying, selling or leasing property in Malaysia should be handled with a Malaysian registered estate agent and a Malaysian conveyancing lawyer. Rules change, so confirm with PTJ, LHDN, Customs (SST), MIDA and your advisers before you commit.
Sources
Facts on this page were checked against these sources on 9 November 2026.
- LTA and Ministry of Transport, Malaysia: RTS Link service targeted for February 2027 lta.gov.sg, checked 9 November 2026
- PTJ: acquisition of property by a foreign interest ptj.johor.gov.my, checked 9 November 2026
- Stamp Act 1949, reprint as at 1 January 2026 hasil.gov.my, checked 9 November 2026
- Royal Malaysian Customs: FAQ on the 2025 service tax expansion mysst.customs.gov.my, checked 9 November 2026