Key takeaways
- 12 months is the usual defect liability period, starting at key collection or on the 15th day after notice of TOP.
- Put every defect in writing, with photos, before you renovate.
- Developers are generally expected to rectify within about a month of a proper notice.
- Curtains, grilles and digital locks wait until the items you want the developer to fix are logged.
The numbers
- Length
- 12 months
- Starts
- Key collection, or the 15th day after TOP notice
- Your job
- Written list, with photos, inside the 12 months
- Developer's job
- Rectify, commonly within about a month of notice
- Before hacking
- Finish the inspection, then renovate
When the 12 months start
On a new sale, the sale and purchase agreement gives you a defect liability period of 12 months. Two dates matter.
| Event | What happens |
|---|---|
| You collect keys on the appointment | The 12 months start that day |
| You delay, and the notice has already been served | The 12 months can start on the 15th day after the notice, even if the keys are still in the site office |
BTO flats use HDB’s defect form at the key collection appointment. Condos use the developer’s form and, if you want a second pair of eyes, your own inspector. Either way the list has to exist inside the 12 months. A WhatsApp to the agent in month 13 is late.
What to log, and in what order
Walk the unit before a single trade starts.
- Walls, tiles, waterproofing, windows, doors, sanitary fittings, the air-con and the electrical points. Photograph each item and send the list to the developer in writing.
- Give them the month they are supposed to have. Chase in writing if nothing is booked.
- Only then hack, repaint or move a wall. A hacked wall is no longer their defect.
- Measure curtains and invisible grilles to the structural opening once you know the windows are not being replaced. Curtains.sg should see the final frame.
- Fit the digital lock after you know the door is staying. HomeySG can do the defect walk and the lock on a later visit so the two are not tangled.
New launches and the area you think you bought
If the project is on the harmonised GFA rules, the air-con ledge is outside the strata area and still outside the glass. Defects on that ledge are still the developer’s, because it is their building, but your curtains do not cover it. Read GFA harmonisation before you argue with the area schedule at the same time as the defect list. They are different complaints.
Questions on this topic
I collected keys late. Did I lose months?
Often yes. If you do not collect within the window in the notice, the period can start on the 15th day after the developer told you TOP was ready, not on the Saturday you finally turned up. Read the notice for the date.
The developer says the hollow tile is wear and tear.
Hollow tiles, cracked plaster, leaking windows and misaligned doors at handover are defects, not wear. A chip you make while moving a sofa in month six is yours. Photograph the difference.
Can I hack a wall during the defect period?
You can, after the inspection. Hacking first destroys the evidence and can void the claim on that wall. Log the defects, agree what the developer will touch, then renovate.
Who checks the list if I do not trust my own eyes?
A defect inspector walks the unit with a moisture meter and a tapping rod. HomeySG does that, and the same visit can cover the digital lock once you know which door the developer is not replacing.
Get a personalised Singapore shortlist and financing check
Share your budget and what you're comparing. We'll reply on WhatsApp with matching units, recent caveats and your exact cash/CPF breakdown.
Sources
Facts on this page were checked against these sources on 26 October 2026.