Key takeaways
- A private home inspection is optional. This page did not find a rule that makes one compulsory.
- The useful windows are the option period, BTO key collection and the defect liability period.
- HDB's Request for Value prices the flat for CPF and the loan. It is not a defect survey.
- Ask the inspector for a written quote. This page does not publish a fee.
The numbers
- Compulsory?
- No mandatory private inspection found
- HDB Request for Value
- S$120 including GST. A valuation, not a snag list
- Inspector's fee
- The written quote, paid to the inspector
- Who Fiona is
- A CEA estate agent, not an inspector
Optional, on the pages checked
A buyer can walk a flat with a torch and a marble. A buyer can also pay someone whose job is finding cracks, leaks and uneven floors. Neither step is, on the official pages read for this guide, a condition of buying an HDB flat or a condo.
HDB’s key collection page tells you what to pay and what to bring to the appointment. It does not tell you to hire a private inspector. A private resale option is a contract with the seller. The days in that option are the time you have to decide. They are not a statutory inspection order.
If a salesperson says the deal cannot proceed without their inspector, ask them to point to the rule. If they cannot, treat the inspection as a service you may buy, not a gate.
Three ways to look at the same flat
| Approach | Who looks | What you get | What you still do |
|---|---|---|---|
| DIY snag | You, with a list | Notes and photos you took | You decide what is a defect and what is wear |
| Paid inspection | An inspector you appoint | A written report, if that is what the quote says | You still report HDB or developer defects through their process |
| Contractor walk-through | A renovator pricing work | A quote for work they would do | A quote is not a defect report, and a defect report is not a renovation price |
The three answers are easy to mix up. An inspector who is paid to list defects should not be the only person pricing the repairs, or you cannot tell a finding from a sales line. A contractor who walks the flat to price a kitchen is useful for the kitchen and silent about the things they do not sell. Doing it yourself costs time and misses what you do not know to look for. Many households do two of the three: their own notes, then either a paid report or a contractor, not a single person wearing every hat.
Fiona Wang is a CEA-registered estate agent. She is not an inspector. The form on this page asks her for an introduction. You choose the inspector and you pay the inspector.
When people actually do it
Option period, private resale. After the seller grants an option, you have the option period in that document to investigate and to decide whether to exercise. Book access with the seller. A report that arrives after you have exercised cannot unwind the option. Ask the inspector, before you pay, whether they can attend inside the days you have left.
BTO and SBF key collection. You see the flat as HDB hands it over. Photograph rooms before furniture arrives. Defects that are HDB’s belong in HDB’s defect process, which the defect liability guide separates from renovation. A private inspector can stand next to you. They do not replace the report you file with HDB.
Defect liability period. New condos and new HDB flats have a period in which the developer or HDB repairs specified defects. The same guide sets out how that window works. An inspection in that period is about capturing defects while someone else is still obliged to repair them. An inspection after the period is about what you will now pay to repair yourself.
Resale HDB, before you exercise. The buyer must submit a Request for Value by the next working day after the option date if CPF or a housing loan will pay for the flat. That request is about value. It is a sensible moment to have already looked at the flat, because the option clock and the valuation clock run together. Cash-only buyers do not need the request. They still have the option period.
What HDB’s S$120 buys
HDB states the processing fee for a Request for Value as S$120, including GST. You submit it on My Flat Dashboard with page 1 of the Option to Purchase. The outcome is typically available within 10 working days, and it is valid for 3 months from the day it appears. The loan and CPF use are tied to that value unless the bank says otherwise.
Nothing on that page describes a snag list, a damp reading or a floor-level survey. If the flat has a leaking bathroom, the Request for Value will not itemise it. Budget the defect separately. The valuation guide compares this figure with an agent’s market review, a bank valuation and a licensed appraiser’s report.
A walk-through list, with no prices on it
Use the same list whether you are the inspector or you hired one. Tick what you saw. Do not invent a cost beside the tick. The quote comes later, from the person who would do the work.
- Walls and ceilings: cracks, water stains, hollow tiles where you can tap.
- Floors: slopes toward a drain, lips between tiles, soft spots.
- Windows and doors: locks, seals, and whether they close.
- Wet areas: run the taps, look under the sink, flush, and check the ceiling of the room below if you can.
- Electrical points and lights: what works on the day, not what a renovation would add.
- Air-conditioning, if any: whether it cools, and the outdoor unit.
- Built-ins you are buying with the flat: doors that shut, shelves that hold.
- Common property you must cross: lobby, lift, and the corridor outside the unit. In a condo that is the MCST’s fabric. In an HDB block it is the town council’s.
Write the date on the photos. A photo without a date is a weak record when someone later says the stain was already there.
Paying for the inspection
Ask three questions before you appoint anyone:
- Is the report in writing, and do you get it?
- Will they attend with you, or only send a junior?
- What is outside the quote (a high-floor access issue, a second visit, lab tests)?
The answer to the fee is the quote. This site does not keep a price list for inspectors, and it does not describe any inspector as approved by HDB, BCA or CEA. CEA regulates estate agents. It does not license home inspectors.
After the report, renovation is a different trade. HDB flats that need a permit must use a contractor from the Directory of Renovation Contractors. That checklist is on the HDB renovation page. A new flat’s sequence, from keys to defects to works to movers, is the key collection checklist.
If the report is for a purchase you may still walk away from, decide before the option deadline, not after the report has been filed in a drawer.
Get an introduction
Tell us what you need. The service below is set for this page and you can change it. Fiona replies on WhatsApp.
Thank you
Fiona has your introduction request and will reply on WhatsApp. For anyone other than her estate agency work, you choose the professional and you pay them directly.
WhatsApp FionaQuestions on this topic
Do I have to hire a home inspector in Singapore?
This page did not find a statute that requires a private home inspection before you exercise an option, complete a purchase, or collect BTO keys. HDB and developers have their own defect processes. A paid inspection is a choice.
Is HDB's Request for Value an inspection?
No. HDB says the Request for Value determines the flat's value for CPF use and as a reference for the housing loan, unless the bank says otherwise. The processing fee is S$120 including GST. It is not a list of defects.
When is a defect inspection useful?
During a private option period, at BTO key collection, and during the defect liability period while the developer or HDB is still responsible for the defects they must repair. The defect guide covers that window.
How much does an inspection cost?
Ask for a written quote. This page does not state a price, a package or a percentage.
Get a personalised Singapore shortlist and financing check
Share your budget and what you're comparing. We'll reply on WhatsApp with matching units, recent caveats and your exact cash/CPF breakdown.
Sources
Facts on this page were checked against these sources on 12 November 2026.
- HDB: Request for Value hdb.gov.sg, checked 12 November 2026
- HDB: key collection hdb.gov.sg, checked 12 November 2026
Fact-checked against HDB, IRAS, CPF, MAS.