Seven checks before you pay the option fee
What is included
- Buyer's Stamp Duty uses the residential tiers from 15 February 2023. ABSD follows the toggle. Demolition (BCA CR03) is S$40,000, S$60,000 or S$80,000 from the built area. Professional fees are 9% of construction, inside the 8% to 10% band for QP, PE and BCA submissions.
- A tree over 1.0 m girth, measured 0.5 m above the ground, in a Tree Conservation Area (central TCA covering parts of D10, D11 and D21, or the Changi TCA) needs NParks approval under the current guidelines. Budget about S$20,000 and three to six months, not a chainsaw.
- A sewer inside the lot and a culvert or road-reserve setback are allowances, not quotes. Get PUB and LTA in writing before you exercise.
- Contractor matching for a CW01 general building firm sits with FY Advisers.
A cost stack for comparison, not a tender. Psf rates move with the spec and the basement. Checked 26 October 2026.
On this page
Key takeaways
- Construction planning rates are S$450 psf standard, S$550 psf premium and S$650 psf and up once a basement or a luxury spec is in the drawing.
- Demolition sits around S$40,000 to S$80,000, and professional fees around 8% to 10% of the build.
- Budget 24 months of rent, often S$150,000 to S$300,000, while the new house is built.
- Trees over 1.0 m girth, a sewer in the lot and an LTA culvert can each move the programme before they move the price.
The numbers
- Build cost
- S$450, S$550 or S$650+ per square foot of GFA
- Demolition
- About S$40,000 to S$80,000 (CR03)
- Professional fees
- About 8% to 10% of construction
- Interim rent
- 24 months, often S$150,000 to S$300,000
- Tree trigger
- Girth over 1.0 m, measured 0.5 m above ground, in a TCA
What goes into the all-in figure
The land price is the number in the listing. The calculator adds residential Buyer’s Stamp Duty, the ABSD rate you toggle, demolition, construction at the spec you pick, 9% professional fees and 24 months of the rent you type in.
Risk flags add allowances, not quotations: about S$20,000 if a protected tree is in the way, about S$55,000 if a sewer or manhole sits inside the lot, and about S$40,000 if a road reserve or culvert has to move. Replace them with consultant numbers before you exercise.
Standard, premium, basement
S$450 a square foot is the planning rate for a plain two-storey house. S$550 is a higher finish without changing the engineering. S$650 and up is where basements and a luxury specification sit, because the cost is waterproofing and structure, not only stone.
The break-even price per square foot of GFA is the all-in cost divided by the house you intend to build. The per-land-square-foot line is the same cost divided by the plot, which is how landed listings are often compared.
Seven checks before the option fee
- Title, road line and whether the plot is a good class bungalow.
- The envelope you can actually build, against setbacks, not against a hope.
- Every tree, with girth measured properly, inside or outside a Tree Conservation Area.
- The PUB sewer plan.
- The LTA road reserve and the entrance culvert.
- A demolition figure in the S$40,000 to S$80,000 band, rising with the old house.
- A CW01 general building contractor who has finished houses, not a renovation crew. FY Advisers keeps that list.
The wider buying rules, including who needs SLA approval, are in the landed property guide.
Questions on this topic
Is S$450 a square foot enough to rebuild a terrace?
It is a fair planning rate for a straightforward two-storey house without a basement. A basement, a high specification or a constrained city-fringe site belongs in the S$650 band. Ask two builders to price the same drawings before you treat either number as a tender.
Do I pay ABSD on the old house I am about to demolish?
Yes if the purchase is a second residential property, or if you are a foreigner. You pay it on the land you buy, even though you intend to pull the house down. A citizen's first home is 0%. FTA nationals are treated as citizens.
What is a Tree Conservation Area check?
NParks controls trees in the central TCA, which takes in parts of Districts 10, 11 and 21, and in the Changi TCA. A tree over 1.0 m in girth, measured 0.5 m above the ground, is not yours to remove because it is in the way of a new footprint.
Should I buy turnkey instead?
When the all-in rebuild, including two years of rent and the risk items, is close to the price of a finished house on a similar plot, the turnkey house is the simpler purchase. The break-even line in the calculator is that comparison.
Get a landed valuation
Tell us the estate and house type. We'll send recent landed prices nearby and, if you're rebuilding, a note on what to check before you pay an option fee.
Sources
Facts on this page were checked against these sources on 26 October 2026.
- BCA: Demolition and structural works www1.bca.gov.sg, checked 26 October 2026
- NParks: Trees and development nparks.gov.sg, checked 26 October 2026
- URA: Landed housing ura.gov.sg, checked 26 October 2026
- IRAS: Buyer's Stamp Duty iras.gov.sg, checked 26 October 2026